MIL-K-70493(AR)
4.7.1 Government testing. When the Government is responsible for conducting reliability tests, the contractor prior to submitting the sample to the Government, shall inspect the sample to assure that it conforms to all requirements of the contract and submit a record of this inspection with the sample, including certificates of conformance for all materials.
4.7.2 Contractor testinq. When the contractor is responsible
for conducting reliability tests, the sample shall be inspected
and tested by the contractor for all the requirements of the contract. The sample and a record of these inspections and tests, including certificates of conformance for all materials, shall be submitted to the Government for approval. The Government reserves the right to witness any or all of the contractors reliability tests and inspections.
5. PREPARATION FOR DELIVERY
5.1 Delivery requirements. Handling, packaging, packing, shipping, and marking of the Data Entry Keyboard, 9355810 shall be in accordance with Packaging Data Sheet 9355810. The level of protection shall be as specified in the procurement document.
6. NOTES
6.1 Intended use. The keyboard described herein is intended for use in the MBC. See drawing 11785850.
6.2 Ordering data. Procurement documents shall specify the following:
a. Title, number and date of this specification. b. Provisions for first article testing.
c. Provisions for reliability testing. d. Applicable Packaging Data Sheet.
e. Applicable levels of preservation, packing, and
marking (see 501).
f. Applicable stock numbers.
Custodian: Army-AR
Preparing activity: Army-AR
(Project 1220-A301)
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business